10kV distribution line installation process standard

2020-09-24 18:35:24

1. "Three racks" installation process for power distribution lines

1.1 Installation of section and branch switch lead frame

Process specification:

1. The cross arm and support of each layer should be parallel, and the left and right skew and the up and down skew should not be greater than 1% of the total length of the cross arm.

2. The three-phase leads should be arranged neatly, the arcs should be parallel and consistent, and the distance between the lead fixing points should not exceed 1.5m.

3. The electrical connection of each contact should be tight, and the connection between the terminal and the lead should be equipment clamp or terminal. When the lead is 150mm2 and above, the equipment clamp or terminal and the terminal should be fixed with 2 bolts. When using equipment clamps, the wires entering the equipment clamps should be wrapped with aluminum tape first.

4. The lead wires of the equipment on the pole should be 10KV insulated wires.

5. The switch and supporting frame should have at least 2 fixed points.

6. The switch should be installed on the side that is easy for personnel to reach and operate.

1.2 Installation of cable lead frame with knife switch

Process specification:

1. The cross arms and supports of each layer should be parallel, and the left and right skew, and the up and down skew should not exceed 1% of the total length of the cross arm.

2. The three-phase leads should be arranged neatly, the arcs should be parallel and consistent, and the distance between the lead fixing points should not exceed 1.5m.

3. The electrical connection of each contact should be tight, and the connection between the terminal and the lead should be equipment clamp or terminal. When the lead is 150mm2 and above, the equipment clamp or terminal and the terminal should be fixed with 2 bolts. When using equipment clamps, the wires entering the equipment clamps should be wrapped with aluminum tape first.

4. All equipment leads on the pole should use 10KV insulated wires.

5. The mouth of the cable protection pipe shall be sealed with fire-resistant cement.

6. The cable should be hung with a nameplate.

7. The cable support and protection tube should be connected to the grounding device.

Cixi Yicheng Electric Co., Ltd.

Add:Cixi Economic Development Zone, Zhejiang (No. 32, Fuqiang, Mazhong Village, Hangzhou Bay New District)

 

Contact us

E-Mail:web@nb-yicheng.com

Tel:0086-574-63488705  

Fax:0086-574-63488255

First-class quality, creating a Chinese famous brand

Home        About us        Products        News        Join us        Feedback        Contact us       

Copyright ? 2020 Cixi Yicheng Electric Co., Ltd. All rights reserved.